You are here

Impact of the longer change and clearance intervals on signalized intersections and corridors

Download pdf | Full Screen View

Date Issued:
2016
Abstract/Description:
Evaluating the impact of longer change and clearance intervals on signalized intersections and corridors is the main goal of this study. In fact, the Florida department of Transportation (FDOT) has adopted a new signal retiming effort in a number of signalized intersections along several corridors. The Orange County started implementing the new signal timing from December, 2013 and completed it in June, 2015. The other objective of this new signal timing is to minimize the red light running rate. This study is dedicated to investigate the signal retiming effort adopted by the FDOT and how the new signal timing might impact the studied signalized intersections' performance and safety. To address this issue, a number of signalized intersections along three corridors in Orange County were investigated during different three time of the day periods AM, MD, and PM. Additionally, three categories of signal timings were adopted to better understand the performance and safety of old (pattern 1), current (pattern 2), and proposed (pattern 3) signal timings. The analysis was based on the Simtraffic simulation which is a part of Synchro 8 software. The research results provide that the signalized intersection's performance along the three corridors during the three plans of the day were found significantly affected by lengthening the change and clearance intervals. Signal timing 2 and 3 were observed significantly different than signal timing 1 which have greater intersection delay, queue length, intersection overall volume to capacity v/c ratio, and Intersection capacity utilization ICU. Furthermore, the results show that the signal timing 2 and signal timing 3 significantly increase the total delay and travel time along the studied arterials during the three plans of the day.
Title: Impact of the longer change and clearance intervals on signalized intersections and corridors.
18 views
8 downloads
Name(s): Alfawzan, Mohammed, Author
Radwan, Essam, Committee Chair
Eluru, Naveen, Committee Member
Abou-Senna, Hatem, Committee Member
University of Central Florida, Degree Grantor
Type of Resource: text
Date Issued: 2016
Publisher: University of Central Florida
Language(s): English
Abstract/Description: Evaluating the impact of longer change and clearance intervals on signalized intersections and corridors is the main goal of this study. In fact, the Florida department of Transportation (FDOT) has adopted a new signal retiming effort in a number of signalized intersections along several corridors. The Orange County started implementing the new signal timing from December, 2013 and completed it in June, 2015. The other objective of this new signal timing is to minimize the red light running rate. This study is dedicated to investigate the signal retiming effort adopted by the FDOT and how the new signal timing might impact the studied signalized intersections' performance and safety. To address this issue, a number of signalized intersections along three corridors in Orange County were investigated during different three time of the day periods AM, MD, and PM. Additionally, three categories of signal timings were adopted to better understand the performance and safety of old (pattern 1), current (pattern 2), and proposed (pattern 3) signal timings. The analysis was based on the Simtraffic simulation which is a part of Synchro 8 software. The research results provide that the signalized intersection's performance along the three corridors during the three plans of the day were found significantly affected by lengthening the change and clearance intervals. Signal timing 2 and 3 were observed significantly different than signal timing 1 which have greater intersection delay, queue length, intersection overall volume to capacity v/c ratio, and Intersection capacity utilization ICU. Furthermore, the results show that the signal timing 2 and signal timing 3 significantly increase the total delay and travel time along the studied arterials during the three plans of the day.
Identifier: CFE0006064 (IID), ucf:50970 (fedora)
Note(s): 2016-05-01
M.S.
Engineering and Computer Science, Civil, Environmental and Construction Engineering
Masters
This record was generated from author submitted information.
Subject(s): Signalized Intersections -- longer Change and Clearance Intervals -- Dilemma and Option Zones
Persistent Link to This Record: http://purl.flvc.org/ucf/fd/CFE0006064
Restrictions on Access: public 2016-05-15
Host Institution: UCF

In Collections