Current Search: Arena (x)
-
-
Title
-
Joining the "Big Leagues": Politics, Race, and the Pursuit of NBA Franchises in Miami and Orlando, 1982-1987.
-
Creator
-
Hillyer, Garrett, Crepeau, Richard, Lester, Connie, Lyons, Amelia, University of Central Florida
-
Abstract / Description
-
This thesis analyzes the formation of two National Basketball Association (NBA) franchises(-)the Miami Heat and the Orlando Magic(-)and the efforts of groups representing both cities to procure those franchises between 1982 and 1987. Drawing primarily from discourse found in local newspapers, this thesis serves as a case study of the dual nature of sport to both unite and divide communities. While proponents of the NBA in Miami and Orlando preached the social, cultural, and economic benefits...
Show moreThis thesis analyzes the formation of two National Basketball Association (NBA) franchises(-)the Miami Heat and the Orlando Magic(-)and the efforts of groups representing both cities to procure those franchises between 1982 and 1987. Drawing primarily from discourse found in local newspapers, this thesis serves as a case study of the dual nature of sport to both unite and divide communities. While proponents of the NBA in Miami and Orlando preached the social, cultural, and economic benefits of sport, they ignored the ways in which the pursuit of sport divided local governments and perpetuated historic hostility toward African-American residents in each city. Debates over basketball arena funding created deep divisions within and between city, county, and state governments. Arena construction ultimately displaced hundreds of families in the historically African-American neighborhoods of Overtown (Miami) and Parramore (Orlando). Still, prospective NBA franchise owners in each city promised residents that professional sport would galvanize their community, provide national relevance, and spur economic revitalization. Although city and team officials attempted to shape the discourse surrounding their NBA pursuit as wholly unifying, underlying discourse revealed divisions within each city.Chapter one explores the history of arena and sport-related politics in Miami, relays the history of racial prejudice by Miami government toward Overtown African Americans, and analyzes how these two histories influenced the funding and location of the city's eventual NBA arena. Similarly, Chapter two explores the history of arena politics in Orlando, relays the history of racial prejudice from municipal government toward Parramore residents, and analyzes the relation of these two elements to the financing and planning of Orlando's arena. Chapter three analyzes prospective NBA ownership groups in Miami and Orlando, their structural makeup, characteristics, and their efforts to sell season-ticket deposits in hopes of luring the league to their city. Chapter four analyzes the underlying destructive discourse surrounding the arenas and prospective franchises, particularly as it relates prejudicial language toward Overtown and Parramore and vitriolic language between Miami and Orlando.
Show less
-
Date Issued
-
2016
-
Identifier
-
CFE0006324, ucf:51554
-
Format
-
Document (PDF)
-
PURL
-
http://purl.flvc.org/ucf/fd/CFE0006324
-
-
Title
-
MEASURING THE EFFECT OF ERRATIC DEMANDON SIMULATED MULTI-CHANNEL MANUFACTURINGSYSTEM PERFORMANCE.
-
Creator
-
Kohan, Nancy, Kulonda, Dennis, University of Central Florida
-
Abstract / Description
-
ABSTRACT To handle uncertainties and variabilities in production demands, many manufacturing companies have adopted different strategies, such as varying quoted lead time, rejecting orders, increasing stock or inventory levels, and implementing volume flexibility. Make-to-stock (MTS) systems are designed to offer zero lead time by providing an inventory buffer for the organizations, but they are costly and involve risks such as obsolescence and wasted expenditures. The main concern of make-to...
Show moreABSTRACT To handle uncertainties and variabilities in production demands, many manufacturing companies have adopted different strategies, such as varying quoted lead time, rejecting orders, increasing stock or inventory levels, and implementing volume flexibility. Make-to-stock (MTS) systems are designed to offer zero lead time by providing an inventory buffer for the organizations, but they are costly and involve risks such as obsolescence and wasted expenditures. The main concern of make-to-order (MTO) systems is eliminating inventories and reducing the non-value-added processes and wastes; however, these systems are based on the assumption that the manufacturing environments and customers' demand are deterministic. Research shows that in MTO systems variability and uncertainty in the demand levels causes instability in the production flow, resulting in congestion in the production flow, long lead times, and low throughput. Neither strategy is wholly satisfactory. A new alternative approach, multi-channel manufacturing (MCM) systems are designed to manage uncertainties and variabilities in demands by first focusing on customers' response time. The products are divided into different product families, each with its own manufacturing stream or sub-factory. MCM also allocates the production capacity needed in each sub-factory to produce each product family. In this research, the performance of an MCM system is studied by implementing MCM in a real case scenario from textile industry modeled via discrete event simulation. MTS and MTO systems are implemented for the same case scenario and the results are studied and compared. The variables of interest for this research are the throughput of products, the level of on-time deliveries, and the inventory level. The results conducted from the simulation experiments favor the simulated MCM system for all mentioned criteria. Further research activities, such as applying MCM to different manufacturing contexts, is highly recommended.
Show less
-
Date Issued
-
2004
-
Identifier
-
CFE0000240, ucf:46275
-
Format
-
Document (PDF)
-
PURL
-
http://purl.flvc.org/ucf/fd/CFE0000240